Share:
Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp
Share on email

Case Study: Roundabout alterations and carpark surfacing

The existing roundabout was too large causing issues with trucks constantly being unable to get around it.

We undertook to reduce the size the roundabout, relay the road surface and then lay a new 40mm overlay surface for the car parking area as well.